Einhorn Engineering’s history onboard the R/V Sikuliaq
2015 Stern A-frame Shipboard Load Test
Einhorn Engineering was tasked by UAF to supervise and execute the Shipboard Load Test of the Sikuliaq’s new Stern A-frame manufactured by Allied Systems, Marine Crane Div.
Setting up for the 125% vertical lift load test
Custom 50kip winch foundation designed for Sikuliaq A-frame Load Test
Hydraulic winch installed on foundation. Ready to test.