News

Sonar System Mounting Frame for R/V Richard Barber
Duke Marine Lab’s R/V Richard Barber, constructed by Safe Boats International, is a 30′ long aluminum hulled vessel. Einhorn Engineering was tasked to develop an over-the-side mechanism to operate Duke’s ADCPs.

Scaling up a Wave Energy System
Einhorn Engineering developed creative design solutions for Oscilla Power’s 1/20 scale wave energy power system.

Design of a 3 kV Subsea Electrical Junction Box
Development of a 1,ooo ft rated pressure-balanced subsea junction box to house high voltage electrical components.

A Vertical Deployment System for Tidal Energy Study
Einhorn Engineering develops a vertical launch and recovery system for the Applied Physics Laboratory’s MHK tidal energy test bed project.

The OAWRS Vertical Towed Array & Handling System
Design and fielding of a vertical towed array and novel palletized Launch and Recovery System.

Development of a Specialized Deep Water Mooring Anchor
As part of the the self-mooring buoy project Einhorn Engineering developed a unique and specialized anchor.

Lightweight Towed Array Receiver
A high performance, passive, towed array and companion handling system.

At-Sea Gallery
To design sea-going equipment you need a sea-going engineer. View a gallery of some of our experience at-sea.

Wet Side Junction Box
The subsea transition from the LTAR electro-optic towcable to the passive array.

Hydraulic control console design
Packaging of high performance hydraulic components in an on-deck ruggedized operator control station.